Strategies on server/equipment shutdown based on
temperatures | ||||||
posted by Joachin Thuau on June 11, 2014, 5:30 p.m. | ||||||
| ||||||
Thread Tags: discuss-at-studiosysadmins | ||||||
|
On 2014-06-11 16:14, greg whynott wrote: > had a similar situation. I had a 2 inch hole punched in the UPS by an arc. the UPS installer was missing an isolation mat in the thing. it's funny, since then, we've always had 2 different groups inspect anything electrical... i wish i still had that picture... To unsubscribe from the list send a blank e-mail to mailto:studiosysadmins-discuss-request@studiosysadmins.com?subject=unsubscribe |